UKCW London

12 - 14 May 2026

ExCeL

UKCW Birmingham

29 Sept - 1 Oct 2026

NEC

UKCW London

12 - 14 May 2026

ExCeL

UKCW Birmingham

29 Sept - 1 Oct 2026

NEC

30 Aug 2024

T Beams

Creagh Concrete Stand: B35
T Beams
Creagh manufacture a composite beam and block flooring system. This system holds many advantages when compared to traditional flooring construction methods.

Creagh manufacture a composite Beam and block flooring system. This system holds many advantages when compared to traditional flooring construction methods.

N.H.B.C. and building control regulations state that where infill hardcore is in excess of 600mm, the floor slab must be reinforced or suspended. Creagh T-Beam floors eliminate the need for costly excavation and compaction of the infill.

Installation

Creagh’s T-Beams may be fixed quickly and simply. A typical large bungalow may be laid in a single day using unskilled labour. No oversite concrete is required and surplus soil may be deposited beneath the T-Beams, maintaining a minimum void of 75mm.
It is recommended to grout the joints with 6:1 sharp sand: cement grout and brush well into the joints. Where holes through the floor are necessary, blocks can be omitted and filled up with insitu concrete.

Loading

OUR SPONSORS 2026

OUR PARTNERS