UKCW London: 7-9 May | ExCeL
UKCW Birmingham: 1-3 October | NEC

News

Portishead

22 Jun 2021
Sue Dewhirst
Using the S7 block with external wall insulation.

DESCRIPTION

Replacement dwelling.  3 bedroomed home designed property to suit the clients wish list and plot overlooking the Severn estuary.

 

JUWO Evolved SPECIFICATION INCLUDED:

Structural Engineering to meet Building Regulations

Detailed Working drawings for site

Supply  Installation of JUWO Evolved

SmartWall with additional external wall

insulation.

 

 

CONSTRUCTION:

JUWO SmartWall Construction with

External wall insulation

Triple glazed Alu-clad windows.

Whole House M.V.H.R.

Air Source Heating with Ecocent

for hot water

PV panels to south facing roof

Back to Top
Loading

London Sponsors


 

Birmingham Sponsors

Partners

Previous Attendees